MR
Dashboard/Tabac factory
HYBRIDIn Review

Process Sequence

The happy-path process sequence. A React Flow diagram renders this here in Phase 4; the full branching logic lives under State Machine.

  1. Init
  2. Connect Robot
  3. Release Brake
  4. Check Safety
  5. Wait For Cnc Ready
  6. Capture Part Pose
  7. Move To Pre Pick
  8. Pick Part
  9. Verify Grip
  10. Move To Cnc Pre Load
  11. Force Controlled Insert
  12. Signal Load Complete
  13. Wait For Machining Complete
  14. Remove Part
  15. Place Finished Part
  16. Return Home
  17. End