New Project
Describe the automation task in natural language, and/or upload a spec document. Text is extracted from PDFs and Word files; images are stored for vision evaluation. The requirement-extraction agent (Phase 2) turns all of this into structured requirements.
⚠ Engineering draft — not for direct execution. Generated robot programs are engineering drafts only. They must be reviewed, simulated, risk-assessed, and commissioned by qualified robot and safety engineers before use on real equipment. Do not execute directly on a real robot without validation.